Nutty

Nutty

Home
Notes
Chat
Power Infrastructure
Archive
Leaderboard
About

Power Infrastructure

IREN and NVIDIA’s Strange AI Factory Deal
Big numbers. Stranger structure.
May 8 • Nutty
Not Every AI Power Winner Is the Same
Separating Cycle, Artifact, and Structure in the Transformer Bottleneck
May 6 • Nutty
Who Owns the First 1 Meter?
No power, no compute. In the 1MW rack era, the bottleneck is moving to the first 1 meter.
May 3 • Nutty, Damnang, and PhotonCap
The Next Bloom Energy?
AI is no longer waiting for the grid.
May 1 • Nutty
The AI Power Crisis — Part 4
The Last Micrometer, and Closing the Series
Apr 25 • Nutty
The AI Power Crisis — Part 3
The Last Few Centimeters
Apr 19 • Nutty
The AI Power Crisis — Part 2
The Rack Becomes the New Grid
Apr 17 • Nutty
The AI Power Crisis — Part 1
Two Languages of Electricity
Mar 30 • Nutty
© 2026 Nutty · Privacy ∙ Terms ∙ Collection notice
Start your SubstackGet the app
Substack is the home for great culture